Final | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | CANC |
Dixie Fellows
|
|
|
mark ###-####
|
Final | 8/13/2002 | 8/13/2002 | 8/13/2002 | P | NH |
Dixie Fellows
|
|
|
MARK ###-#### no access..talked to sam 8/13/2002 4:02:08 PM
|
Pressure Test | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 08:19:29. Contact: ###-####.
|
Final | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 08:52:34. Contact: ###-####. lock box 1064 need to complete bbq 8/29/2001 5:26:12 PM
|
Pressure Test | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | PASS |
Dixie Fellows
|
|
|
for a gas line bbq Sam at Empire Heating ###-####
|
Pressure Test | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 09:32:25. Contact: ###-####.
|
Pressure Test | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 07:47:17. Contact: ###-####.
|
Rough-in | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 07:44:49. Contact: ###-####.
|
Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/09/2001 at 13:52:29. Contact: ###-####. need listed u/g duct or encased in 2" concrete 4/10/2001 9:36:36 AM
|
Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 10:48:01. Contact: ###-####.
|