MEC-Aging Inspection | 8/9/2001 | 8/9/2001 | 8/9/2001 | | PASS |
Dixie Fellows
|
|
|
|
Final | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 16:17:29. Contact: ###-####.
|
Pressure Test | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 08:32:02. Contact: ###-####.
|
Rough-in | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/13/2001 at 08:31:38. Contact: ###-####.
|