Final | 4/20/2001 | 4/20/2001 | 4/20/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/20/2001 at 09:19:56. Contact: ###-####. sign occ card 4/20/2001 2:30:40 PM
|
Rough-in | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/17/2001 at 14:41:42. Contact: ###-####.
|
Rough-in | 4/12/2001 | 4/13/2001 | 4/13/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 14:07:52. Contact: ###-####. c/n posted 4/13/2001 10:52:09 AM
|
Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | FAIL |
Dave Lightfoot
|
|
|
grease \\ not per plans 4/6/2001 11:54:12 AM
|
Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | CANC |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 08:10:01. Contact: ###-####. failed in a/m corrections not made 4/6/2001 1:51:08 PM
|