Final | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PASS |
Alan Hauser
|
|
|
fn insp -rochelle ###-####
|
Final | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | FAIL |
Alan Hauser
|
|
|
no answer to call 1/9/2002 12:55:02 PM
|
Final | 12/10/2001 | 12/12/2001 | 12/12/2001 | A | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 14:42:38. Contact: ###-####. need wet side final first 12/12/2001 10:59:31 AM
|
Rough-in | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 13:46:33. Contact: ###-####. called pager #..no return call 11/5/2001 8:45:11 PM
|
Rough-in | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 11:57:16. Contact: ###-####. dampers at ground floor and subbasement and shafts 9/24/2001 9:41:38 AM
|
Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 14:55:58. Contact: ###-####. shafts 1st through 4th floor 9/6/2001 1:08:43 PM
|
Rough-in | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 10:45:44. Contact: ###-####. 4 shafts 8/6/2001 10:44:22 AM
|
Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PART |
Alan Hauser
|
|
|
looked at subbasement, 1st,2nd floor duct and dampers in shafts, dampers in place, shaft walls not built yet, some access doors to be installed by ymc as there run duct into leased spaces 7/24/2001 11:40:40 AM
|
MEC-Aging Inspection | 7/17/2001 | 7/17/2001 | 7/17/2001 | | NR |
Dave Lightfoot
|
|
|
|