Final | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/21/2001 at 08:21:18. Contact: ###-####. partial final for store
|
Final | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | CANC |
Tom Arcoraci
|
|
|
meet stan 8:15 ###-#### est 120 done by 411 8/8/2001 10:44:50 PM
|
Final | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 11:06:41. Contact: ###-####. called and left message...need info about job 8/8/2001 10:47:13 AM
|
Final | 8/8/2001 | 8/8/2001 | 8/8/2001 | | FAIL |
Dixie Fellows
|
|
|
need more info on inspections from dave L. 8/8/2001 3:43:24 PM
|
Rough-in | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 13:19:08. Contact: ###-####.--partial r/i for the grease duct only in deli-bakery
|
MEC-Aging Inspection | 7/17/2001 | 7/17/2001 | 7/17/2001 | | NR |
Dave Lightfoot
|
|
|
|