Final | 4/18/2001 | 4/19/2001 | 4/19/2001 | P | PASS |
Alan Hauser
|
|
|
around 4:00 if possible someone will be there Mike ###-####
|
Rough-in | 4/18/2001 | 4/18/2001 | 4/18/2001 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 09:57:30. Contact: ###-####. need installation in structions on site 4/18/2001 2:45:13 PM
|