Final | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/04/2001 at 07:50:36. Contact: ###-####.
|
Pressure Test | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 10:14:58. Contact: ###-####.
|
Rough-in | 4/27/2001 | 4/27/2001 | 4/27/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 10:14:32. Contact: ###-####.
|