MEC-Aging Inspection | 11/1/2001 | 11/1/2001 | 11/1/2001 | | PASS |
Dave Lightfoot
|
|
|
|
Final | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:48:18. Contact: ###-####.
|
Rough-in | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | FAIL |
Alan Hauser
|
|
|
8/1/2001 4:12:14 PM
|
MEC-Aging Inspection | 7/26/2001 | 7/26/2001 | 7/26/2001 | | NR |
Dave Lightfoot
|
|
|
|
Rough-in | 4/26/2001 | 4/26/2001 | 4/26/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 09:58:24. Contact: ###-####. 4/26/2001 2:13:26 PM
|
Pressure Test | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | FAIL |
Dixie Fellows
|
|
|
need equipment list and btu load 4/23/2001 1:08:22 PM
|
Rough-in | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### seal r/a at 2nd floor garage wall 4/23/2001 1:08:47 PM
|