Final | 1/25/2002 | 1/28/2002 | 1/28/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by Inspector: 411 On 1/25/2002 5:05:45 PM
|
Final | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | CANC |
Dixie Fellows
|
|
|
###-#### ,,,who did the gas 1/25/2002 7:30:18 AM
|
Final | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | CANC |
Alan Hauser
|
|
|
###-####
|
Pressure Test | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PASS |
Alan Hauser
|
|
|
Added by Inspector: 350 On 11/29/2001 3:18:05 PM
|
Rough-in | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PASS |
Alan Hauser
|
|
|
###-#### BOTTOM PART TOP BEEN FINALED
|
Rough-in | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Alan Hauser
|
|
|
upstairs only, missed one r.a. sleeve through wall by front door, rest ok 11/14/2001 9:13:23 AM
|
MEC-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 | | PASS |
Alan Hauser
|
|
|
|
Final | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 09:47:47. Contact: ###-####.
|
Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 10:58:53. Contact: ###-####. lockbox is 1670 finish gasline at furn 6/19/2001 2:39:08 PM
|
Pressure Test | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/01/2001 at 08:48:33. Contact: ###-####.
|
Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 | P | PART |
Alan Hauser
|
|
|
bath fans ok in basement, 1 of 2 pressure tests failed, south end failed 4/30/2001 3:07:50 PM
|
Rough-in | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 09:03:13. Contact: ###-####.
|