Final | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 15:33:10. Contact: ###-####.--call 1st before insp
|
Final | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | NR |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 11:03:51. Contact: ###-####.
The back door is open and under construction and you are welcome to enter and inspect
|
Rough-in | 5/1/2001 | 5/1/2001 | 5/1/2001 | P | PASS |
Dave Lightfoot
|
|
|
###-#### r/i- jeff
|
Rough-in | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | FAIL |
Dave Lightfoot
|
|
|
###-#### c/n posted 4/27/2001 10:14:03 AM
|
Rough-in | 4/25/2001 | 4/26/2001 | 4/26/2001 | A | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/25/2001 at 11:21:04. Contact: ###-####.
|
Rough-in | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | FAIL |
Alan Hauser
|
|
|
corrections posted 4/24/2001 10:59:41 AM
|