Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Alan Hauser
|
|
|
condensate overlows appear to be fixed, no water present, range exhaust finished 8/17/2001 12:56:55 PM
|
Final | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | FAIL |
Alan Hauser
|
|
|
corrections in 201, 203, 302, 205 8/16/2001 4:29:06 PM
|
Rough-in | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 15:47:15. Contact: ###-####.
|
Rough-in | 6/29/2001 | 7/2/2001 | 7/2/2001 | A | FAIL |
Alan Hauser
|
|
|
tower 2, 1st and 3rd floor reinspection ###-####1st floor ok, 3rd floor covered, contractor to remove sheetrock at each end of dryer vents for inspection 7/2/2001 10:04:56 AM
|
Rough-in | 6/28/2001 | 6/28/2001 | 6/28/2001 | P | FAIL |
Alan Hauser
|
|
|
on the second tower Dave ###-####not finished with 3rd floor, 3 of 4 dryer vents broken on 1st floor 6/28/2001 3:15:09 PM
|
Rough-in | 6/26/2001 | 6/26/2001 | 6/26/2001 | P | FAIL |
Alan Hauser
|
|
|
reinspection on the first tower 3rd floor on the reducers ###-####all work covered 6/26/2001 1:36:26 PM
|
Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PART |
Dixie Fellows
|
|
|
Jeff ###-#### west tower 2nd and 3rd floor partial
|