Final | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 08:25:49. Contact: ###-####.
|
Pressure Test | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 15:16:38. Contact: ###-####.
|
Rough-in | 5/3/2001 | 5/4/2001 | 5/4/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/03/2001 at 15:16:10. Contact: ###-####.
|