Final | 8/31/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 8/31/2001 8:58:16 AM signed temp occ and left notice
|
Pressure Test | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 14:59:33. Contact: ###-####.
|
Pressure Test | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | FAIL |
Alan Hauser
|
|
|
pressure test failed, and no drawings of piping, engineered drawings required for 2# system, no table in 97 umc 7/10/2001 10:43:13 AM
|
Rough-in | 7/3/2001 | 7/5/2001 | 7/5/2001 | A | CANC |
Alan Hauser
|
|
|
done by #411 7/5/2001 10:42:29 AM
|
Conference | 6/28/2001 | 6/28/2001 | 6/2/2001 | P | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/28/2001 at 08:24:44. Contact: ###-####.dixie will do am today
|
Conference | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | PASS |
Dixie Fellows
|
|
|
Added by Inspector: 411 On 5/14/2001 1:26:26 PM
|
Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 | P | CANC |
Alan Hauser
|
|
|
done by #411 5/14/2001 12:19:01 PM
|
Conference | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PASS |
Dixie Fellows
|
|
|
###-####
|