Final | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 15:07:10. Contact: ###-####.
|
Pressure Test | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | FAIL |
Alan Hauser
|
|
|
|
Rough-in | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | FAIL |
Alan Hauser
|
|
|
gasline covered, started to sheetrock 5/30/2001 10:25:34 AM
|