Final | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 09:52:40. Contact: ###-####.
|
Final | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Alan Hauser
|
|
|
need seperation between rtu flue and opening in next rtu 8/14/2001 3:34:50 PM
|
Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PART |
Alan Hauser
|
|
|
ok for tile ceiling and vents at 2nd flr. w/h ok 7/24/2001 10:51:25 AM
|
Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PART |
Alan Hauser
|
|
|
shower and locker rooms ok for cover 6/28/2001 9:34:54 AM
|
Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | FAIL |
Alan Hauser
|
|
|
duct tape used on duct, plans forbid use of, calls for united mastic 6/27/2001 12:26:04 PM
|
Rough-in | 6/5/2001 | 6/6/2001 | 6/6/2001 | P | PART |
Alan Hauser
|
|
|
CORRECTIONS ON WATER HEATER ROOM 6/6/2001 2:13:59 PM
|