Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 08:35:16. Contact: ###-####. sign occ card 8/27/2001 1:40:58 PM
|
Final | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 08:37:54. Contact: ###-####. r/i ok 8/24/2001 1:15:37 PM
|
MEC-Aging Inspection | 7/23/2001 | 7/23/2001 | 7/23/2001 | | NR |
Dave Lightfoot
|
|
|
|
Rough-in | 5/23/2001 | 5/23/2001 | 5/23/2001 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 07:41:14. Contact: ###-####. hard ceiling cover ok 5/23/2001 3:16:47 PM
|
Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Dave Lightfoot
|
|
|
r/i partial for flu ###-#### vent shaft ok 5/17/2001 2:11:36 PM
|