Final | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 17:16:30. Contact: ###-####.
|
Pressure Test | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Dave Hannah
|
|
|
gas test to range ###-####
|
Rough-in | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/31/2001 at 14:31:07. Contact: ###-####.
|
Rough-in | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 17:41:09. Contact: ###-####. gas failed..need shield at f/p flue in attic 5/31/2001 2:49:50 PM
|
Rough-in | 5/29/2001 | 5/30/2001 | 5/30/2001 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 15:09:41. Contact: ###-####.
|