Final | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 16:12:04. Contact: ###-####.
|
Rough-in | 6/28/2001 | 6/28/2001 | 6/28/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/28/2001 at 07:10:48. Contact: ###-####.
|
Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 10:58:48. Contact: ###-####.
|
Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 10:58:34. Contact: ###-####. seal return air, plumbing pipe penetrations and holes in the floor joist . 1/20/2002 2:13:20 PM
|