Final | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | PASS |
Alan Hauser
|
|
|
SCOTT ###-####
|
Final | 12/3/2001 | 12/3/2001 | 12/3/2001 | P | FAIL |
Alan Hauser
|
|
|
need full 1" supply gas pipe at both sets of furn. and water heaters. have 3/4" NOW 12/3/2001 1:27:18 PM
|
MEC-Aging Inspection | 11/8/2001 | 11/8/2001 | 11/8/2001 | | NR |
Dave Lightfoot
|
|
|
|
Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 16:54:39. Contact: ###-####.
|
Rough-in | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Dave Hannah
|
|
|
8/9/2001 11:23:23 AM
|
Rough-in | 8/8/2001 | 8/8/2001 | 8/8/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 07:13:30. Contact: ###-####. posted corrections...called cont 8/8/2001 3:31:06 PM
|