Final | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 17:05:57. Contact: ###-####.
|
Rough-in | 6/21/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/21/2001 at 07:54:25. Contact: ###-####.
|
Pressure Test | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|
Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### Attic furnace corrections. 6/20/2001 4:03:39 PM
|