Final | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 11:37:15. Contact: ###-####.
|
Pressure Test | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 16:40:12. Contact: ###-####.
|
Rough-in | 7/2/2001 | 7/3/2001 | 7/3/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/02/2001 at 16:39:50. Contact: ###-####.
|