Final | 4/30/2003 | 4/30/2003 | 4/30/2003 | P | PASS |
Alan Hauser
|
|
|
all phases done 4/30/2003 10:57:29 PM
|
Final | 3/10/2003 | 3/11/2003 | 3/11/2003 | A | PART |
Alan Hauser
|
|
|
final for phase 2 only 3/11/2003 7:50:40 PM
|
Rough-in | 1/10/2003 | 1/13/2003 | 1/13/2003 | A | PART |
Steven Webb
|
|
|
###-#### STEVE Phase #2--C/N issued--Need justification why no make-up air on 4-pipe fan coil units on first floor--Rooms 123, 124, 125, 140, 142, 143 and 144. Eng. manufacture spec, or install make-up air. 1/13/2003 10:23:20 AM
|
Final | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/26/2002 at 09:07:46. Contact: ###-####.
|
Rough-in | 3/19/2002 | 3/20/2002 | 3/20/2002 | A | PART |
Alan Hauser
|
|
|
west side and 1st flr. bathrooms 3/20/2002 11:54:13 AM
|
Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PART |
Alan Hauser
|
|
|
east side of sanctuary ok 3/1/2002 11:37:20 AM
|
Rough-in | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PART |
Alan Hauser
|
|
|
basement duct ok, no grid ceiling in, or diff. hook ups 2/5/2002 4:23:13 PM
|
MEC-Aging Inspection | 12/31/2001 | 12/31/2001 | 12/31/2001 | | FAIL |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 | | NR |
Dave Lightfoot
|
|
|
|
MEC-Aging Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 | | NR |
Dave Lightfoot
|
|
|
|
Rough-in | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 06/26/2001 at 10:41:16. Contact: ###-####. toilet room exhaust ok 6/27/2001 9:26:09 AM
|