MEC-Aging Inspection | 11/2/2001 | 11/2/2001 | 11/2/2001 | | PASS |
Dixie Fellows
|
|
|
|
Final | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 15:03:59. Contact: ###-####.
|
Pressure Test | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 07:58:10. Contact: ###-####.
|
Rough-in | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 07:57:43. Contact: ###-####.
|