Final | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 16:56:16. Contact: ###-####.
|
Pressure Test | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 15:28:20. Contact: ###-####.
|
Rough-in | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 15:27:52. Contact: ###-####.
|