MEC-Aging Inspection | 11/8/2001 | 11/8/2001 | 11/8/2001 | | PASS |
Dixie Fellows
|
|
|
|
Final | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 11:20:07. Contact: ###-####.
|
Pressure Test | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 08:39:37. Contact: ###-####.
|
Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 08:39:16. Contact: ###-####.
|