Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 14:25:26. Contact: ###-####.
|
Final | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Alan Hauser
|
|
|
6" clearance at single wall flue connector 8/14/2001 4:00:29 PM
|
Pressure Test | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 14:24:44. Contact: ###-####. New gage....Low reading....Recall. 7/11/2001 11:26:34 AM
|
Rough-in | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 14:24:30. Contact: ###-####.
|
Pressure Test | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Alan Hauser
|
|
|
gage wouldn't drop below 22# when air was released, bent back plate 7/9/2001 2:54:34 PM
|
Rough-in | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Alan Hauser
|
|
|
c/n posted 7/9/2001 2:53:39 PM
|