Final | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### cn issued need installtion guide 8/28/2001 10:34:34 PM
|
Final | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 8/28/2001 10:33:32 PM
|
Final | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 12:03:22. Contact: ###-####. clearances on top..sides..back of f/p not per manufacturer 7/11/2001 10:07:37 AM
|
Pressure Test | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Dave Hannah
|
|
|
pres test ###-#### -ed framinging ok but insulation has paper side out told framer to turn so paper is to wall 7/11/2001 3:25:49 PM
|