Final | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 10:34:18. Contact: ###-####.
|
Rough-in | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:36:14. Contact: ###-####.
|
Pressure Test | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 07:33:12. Contact: ###-####.
|
Rough-in | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 07:32:48. Contact: ###-####.c/n posted to remove return and insulate behind in the exterion wall. 7/26/2001 11:47:59 AM
|
Pressure Test | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 16:37:10. Contact: ###-####. c/n posted 7/24/2001 9:49:06 AM
|
Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 16:36:48. Contact: ###-####. c/n posted 7/24/2001 9:48:57 AM
|