MEC-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | DONE |
Alan Hauser
|
|
|
|
Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 09:29:08. Contact: ###-####.
|
Rough-in | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 10:52:06. Contact: ###-####.
|
Pressure Test | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Steven Webb
|
|
|
###-####
|
Rough-in | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | FAIL |
Steven Webb
|
|
|
merle ###-#### C/N posted-B-Vent to close to vertical wall on roof--(under 5') 7/11/2001 3:25:02 PM
|