Final | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 07:30:56. Contact: ###-####.
|
Final | 10/22/2001 | 10/23/2001 | 10/23/2001 | A | FAIL |
Alan Hauser
|
|
|
c/n posted, talked to pat 10/23/2001 9:42:47 AM
|
Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PART |
Dixie Fellows
|
|
|
meet Chuck at 8:30!!!!!!!!!!!!!!!!!!!!!!!!!! ductwork..exhaust in stinker side ok 9/6/2001 9:28:21 AM
|
Rough-in | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 17:14:20. Contact: ###-####.
|
Conference | 7/12/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 09:25:43. Contact: ###-####....###-#### 7/12/2001 10:10:49 AM
|