Final | 9/25/2001 | 9/26/2001 | 9/25/2001 | A | CANC |
Dave Lightfoot
|
|
|
###-#### or ###-#### 2 heating systems only Disp set to [CANC] by a contractor via Hello! on 09/25/2001 at 16:16:54.
|
Final | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 15:27:01. Contact: ###-####. not called in by heating cont 9/24/2001 9:55:07 AM
|
Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 11:56:17. Contact: ###-####. ok for insulation dining area 8/17/2001 11:13:27 AM
|
Rough-in | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 13:45:56. Contact: ###-####. nobody on site...no contact left message 7/26/2001 10:28:07 AM
|