Final | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 08:35:00. Contact: ###-####.
|
Final | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | FAIL |
Alan Hauser
|
|
|
need comb. air into wh room, not enough volume 9/27/2001 10:02:28 AM
|
Final | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 14:52:15. Contact: ###-####. need comb air...need perm roof access 9/14/2001 11:31:25 AM
|
Rough-in | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | PART |
Alan Hauser
|
|
|
venting water heater only thing left 9/6/2001 2:44:58 PM
|
Rough-in | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Alan Hauser
|
|
|
two bathrooms ok for cover, only thing looked at 7/18/2001 10:43:12 AM
|