MEC-Aging Inspection | 12/26/2001 | 12/26/2001 | 12/26/2001 | | PASS |
Dixie Fellows
|
|
|
finaled by 316 12/28/2001 7:14:08 AM
|
Final | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 09:23:43. Contact: ###-####. C/N cut hole in cab for range hood ......bigger. 9/25/2001 3:51:36 PM
|
Final | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 08:04:01. Contact: ###-####.
|
Rough-in | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 14:14:14. Contact: ###-####.
|
Pressure Test | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-####
|