Final | 12/5/2001 | 12/6/2001 | 12/6/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/05/2001 at 08:51:08. Contact: ###-####. keys are in back kitchen window ledge
|
Final | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | NR |
Dave Lightfoot
|
|
|
###-#### access coide 0000
|
Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 07:54:41. Contact: ###-####. already had a r/i 9/17/2001 2:42:01 PM
|
Rough-in | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 14:57:00. Contact: ###-####.
|
Pressure Test | 8/2/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 10:05:30. Contact: ###-####.
|