Final | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 09:22:16. Contact: ###-####...off 36th 9/26/2001 10:03:19 AM no doors installed on f/wh enclosure at final 9/26/2001 10:20:48 AM
|
Rough-in | 7/25/2001 | 7/25/2001 | 7/25/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 08:37:25. Contact: ###-####.
|
Pressure Test | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | FAIL |
Dixie Fellows
|
|
|
###-#### upper comb to go to the outdoors 7/24/2001 3:42:38 PM
|