Final | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 08:50:37. Contact: ###-####.
|
Pressure Test | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:13:32. Contact: ###-####.
|
Rough-in | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 17:13:17. Contact: ###-####.
|