MEC-Aging Inspection | 12/6/2001 | 12/6/2001 | 12/6/2001 | | PASS |
Dixie Fellows
|
|
|
|
Final | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 13:20:09. Contact: ###-####.
|
Pressure Test | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 11:01:55. Contact: ###-####.
|
Rough-in | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | CANC |
Alan Hauser
|
|
|
already done 8/15/2001 11:32:49 AM
|
Pressure Test | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 13:50:35. Contact: ###-####. P/T fail....called. 8/13/2001 8:27:50 AM
|
Pressure Test | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | FAIL |
Alan Hauser
|
|
|
PT FAILED 2ND TIME, $42 REINSPECTION FEE 8/13/2001 2:33:12 PM
|
Rough-in | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 13:50:23. Contact: ###-####.
|