Final | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 15:08:31. Contact: ###-####.
|
Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:54:45. Contact: ###-####.
|
Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 13:05:34. Contact: ###-####.no one at this number knew about this job, didn't recieve any answer back 9/11/2001 12:10:39 PM
|
Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 | P | PART |
Alan Hauser
|
|
|
Added by Inspector: 350 On 9/11/2001 3:14:28 PM duct detectors, roof access needed
|