Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 11:12:16. Contact: ###-####.
|
Rough-in | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 16:00:35. Contact: ###-####.
|
Pressure Test | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 11:02:23. Contact: ###-####.
|
Rough-in | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 11:02:56. Contact: ###-####. upper comb air to term outside 9/7/2001 3:24:31 PM
|