Final | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 11:12:35. Contact: ###-####.
|
Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 14:38:49. Contact: ###-####.
|
Pressure Test | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 11:44:28. Contact: ###-####.
|
Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | FAIL |
Tom Arcoraci
|
|
|
cn posted 8/9/2001 10:42:03 PM
|