Final | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 17:04:39. Contact: ###-####.
|
Final | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 16:06:17. Contact: ###-####. needs a pressure test on gas piping 9/21/2001 10:44:51 AM
|
Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 08:52:19. Contact: ###-####.
|