Final | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 08:30:29. Contact: ###-####.
|
Rough-in | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Alan Hauser
|
|
|
south 2 floors looked at, this should be whole bldg. now looked at 8/21/2001 12:03:23 PM
|
Rough-in | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Alan Hauser
|
|
|
fireplaces and wall dryer vents ok 2nd flr. only 8/3/2001 2:57:25 PM
|