Final | 10/30/2001 | 10/30/2001 | 10/30/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 08:16:47. Contact: ###-####.
|
Final | 10/16/2001 | 10/16/2001 | 10/16/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 07:23:23. Contact: ###-####. C/N on site.....Called. 10/16/2001 10:01:07 AM
|
Pressure Test | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 13:14:40. Contact: ###-####.
|
Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 13:14:20. Contact: ###-####.
|
Pressure Test | 8/8/2001 | 8/9/2001 | 8/8/2001 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 11:03:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/08/2001 at 16:44:49.
|
Rough-in | 8/8/2001 | 8/9/2001 | 8/8/2001 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 11:02:53. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/08/2001 at 16:44:15.
|