Final | 11/8/2001 | 11/8/2001 | 11/8/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 07:26:01. Contact: ###-####.
|
Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PART |
Alan Hauser
|
|
|
grease ducts ok 9/24/2001 2:09:20 PM
|
Conference | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Alan Hauser
|
|
|
for conf-- rob ###-####
|
Rough-in | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Alan Hauser
|
|
|
Added by Inspector: 350 On 9/12/2001 3:51:05 PM duct ok, no grid or grease hoods yet
|
Rough-in | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 09:10:07. Contact: ###-####. flex duct smashed..exhaust duct term location 9/7/2001 10:11:41 AM
|