Final | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Alan Hauser
|
|
|
water heater\\###-#### knock on the door HARD
|
Final | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 17:23:36. Contact: ###-####. pt fail 8/30/2001 10:45:30 PM
|
Pressure Test | 8/31/2001 | 8/31/2001 | 8/31/2001 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 11:21:21. Contact: ###-####....69--a3 8/31/2001 12:24:41 PM...###-#### 8/31/2001 12:26:47 PM
|
Pressure Test | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 17:22:53. Contact: ###-####.
|