Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 09:33:47. Contact: ###-####.
|
Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | P | CANC |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 8/16/2001 4:33:49 PM
|
Rough-in | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 8/16/2001 4:35:44 PM
|
Rough-in | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | CANC |
Alan Hauser
|
|
|
do am on 8/17 8/16/2001 4:40:26 PM
|