Final | 12/4/2001 | 12/4/2001 | 12/4/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 08:13:05. Contact: ###-####.
|
Final | 11/21/2001 | 11/21/2001 | 11/21/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/21/2001 at 09:54:59. Contact: ###-####.c/n on site 11/21/2001 3:43:32 PM
|
Pressure Test | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 8/30/2001 1:29:42 PM
|
Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 16:09:05. Contact: ###-####. c/n posted 8/30/2001 9:43:06 AM
|
Rough-in | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 10:47:28. Contact: ###-####.
|