Final | 6/26/2002 | 6/26/2002 | 6/26/2002 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Pressure Test | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PART |
Russ Owen
|
|
|
###-####line from rear of gas range to unit next to office. 6/10/2002 10:20:43 AM
|
Pressure Test | 6/4/2002 | 6/6/2002 | 6/6/2002 | P | NR |
Dixie Fellows
|
|
|
ROBERT ###-####
|
Pressure Test | 5/31/2002 | 6/3/2002 | 6/3/2002 | P | PART |
Russ Owen
|
|
|
###-#### late pm low press to equip in mech room ok...3 furn to conf room ok...reg vented outside....low pressure to east end furn all floors ok 6/3/2002 2:35:48 PM
|
Rough-in | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 10:38:18. Contact: ###-####. 60# gas at catwalk thru roof ok 4/3/2002 1:59:27 PM
|
Rough-in | 3/19/2002 | 3/19/2002 | 3/19/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/19/2002 at 10:05:12. Contact: ###-####....###-#### brian 3/19/2002 10:53:35 AM 20# gas test for lines in kitchen..union above hard ceiling per plan..access door provided 3/19/2002 5:06:06 PM
|
Rough-in | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | PART |
Alan Hauser
|
|
|
20# test on all low pressure piping on west end ok, and 60# test on piping on west end from second floor to beginning of catwalk in attic ok 3/13/2002 3:27:05 PM
|
Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | PART |
Dixie Fellows
|
|
|
brian ###-#### low pressure to 3rd floor..section c..east end ok 2/26/2002 10:45:33 AM
|
MEC-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | PASS |
Dixie Fellows
|
|
|
WORK IN PROGRESS 1/22/2002 6:32:03 PM
|
Pressure Test | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Alan Hauser
|
|
|
60# test on mainlines and low side on first floor, stubbed into each equipment room and kitchen area. will test rest later, after equipment set, need test on line to roof after upper floors built 11/20/2001 9:50:44 AM
|
MEC-Aging Inspection | 11/5/2001 | 11/5/2001 | 11/5/2001 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Alan Hauser
|
|
|
piping from meter to bldg only 9/5/2001 2:58:43 PM
|