Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberMEC01-02624
StatusFinaled
Name LACY MECHANICAL INC
Site Address 7699 W SPECTRUM ST
Project NameHILTON GARDEN INN-BLDG A
Customer Number62-1
ePlanReview 
Description
9/4/01//ameritel inns inc./gas piping/initial cert of value $10,890/mls// final cert 01/22/03 aim
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/26/20026/26/20026/26/2002PPASS
DetailsDixie Fellows
###-####
Pressure Test6/7/20026/7/20026/7/2002PPART
DetailsRuss Owen
###-####line from rear of gas range to unit next to office. 6/10/2002 10:20:43 AM
Pressure Test6/4/20026/6/20026/6/2002PNR
DetailsDixie Fellows
ROBERT ###-####
Pressure Test5/31/20026/3/20026/3/2002PPART
DetailsRuss Owen
###-#### late pm low press to equip in mech room ok...3 furn to conf room ok...reg vented outside....low pressure to east end furn all floors ok 6/3/2002 2:35:48 PM
Rough-in4/3/20024/3/20024/3/2002PPART
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 04/03/2002 at 10:38:18. Contact: ###-####. 60# gas at catwalk thru roof ok 4/3/2002 1:59:27 PM
Rough-in3/19/20023/19/20023/19/2002PPART
DetailsDixie Fellows
Scheduled by a contractor via Hello! on 03/19/2002 at 10:05:12. Contact: ###-####....###-#### brian 3/19/2002 10:53:35 AM 20# gas test for lines in kitchen..union above hard ceiling per plan..access door provided 3/19/2002 5:06:06 PM
Rough-in3/13/20023/13/20023/13/2002PPART
DetailsAlan Hauser
20# test on all low pressure piping on west end ok, and 60# test on piping on west end from second floor to beginning of catwalk in attic ok 3/13/2002 3:27:05 PM
Pressure Test2/25/20022/26/20022/26/2002APART
DetailsDixie Fellows
brian ###-#### low pressure to 3rd floor..section c..east end ok 2/26/2002 10:45:33 AM
MEC-Aging Inspection1/21/20021/21/20021/21/2002 PASS
DetailsDixie Fellows
WORK IN PROGRESS 1/22/2002 6:32:03 PM
Pressure Test11/19/200111/20/200111/20/2001APART
DetailsAlan Hauser
60# test on mainlines and low side on first floor, stubbed into each equipment room and kitchen area. will test rest later, after equipment set, need test on line to roof after upper floors built 11/20/2001 9:50:44 AM
MEC-Aging Inspection11/5/200111/5/200111/5/2001 CANC
DetailsAlan Hauser
Pressure Test9/5/20019/5/20019/5/2001PPART
DetailsAlan Hauser
piping from meter to bldg only 9/5/2001 2:58:43 PM