Final | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 08:11:24. Contact: ###-####.
|
Final | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 08:48:08. Contact: ###-####. pressure test failed future gas line for range needs tobe attached to flooor 9/10/2001 12:55:11 PM
|