Final | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PASS |
Jim Sly
|
|
|
###-#### ED
|
Rough-in | 9/6/2001 | 9/10/2001 | 9/10/2001 | A | PASS |
Jim Sly
|
|
|
###-#### ed -re-insp
|
Rough-in | 9/5/2001 | 9/6/2001 | 9/6/2001 | A | FAIL |
Dixie Fellows
|
|
|
ED ###-#### PRESSURE TEST seal r/a at 2nd floor by tub...wires 9/6/2001 11:07:33 AM
|